Virginia Corn Hybrid Trials in 2025
ID
SPES-758NP
This publication is available in a PDF file format only.
The 2025 Virginia performance trials of commercial corn (Zea mays L.) hybrids were conducted at six dryland locations; Blacksburg, Montgomery Co., Holland, Nansemond Co. Blackstone, Nottoway Co., Orange, Orange Co., Painter, Accomack Co., Mt. Holly, Westmoreland Co., Shenandoah, Page Co., and one irrigated location - Mt. Holly, Westmoreland Co.
Past Virginia Corn Hybrid Trial publications can be found on the VCE Annual Publications archive.
Virginia Cooperative Extension materials are available for public use, reprint, or citation without further permission, provided the use includes credit to the author and to Virginia Cooperative Extension, Virginia Tech, and Virginia State University.
Virginia Cooperative Extension is a partnership of Virginia Tech, Virginia State University, the U.S. Department of Agriculture (USDA), and local governments, and is an equal opportunity employer. For the full non-discrimination statement, please visit ext.vt.edu/accessibility.
Publication Date
December 22, 2025